FY20 SAULT MAGAZINE FEEDER 4 REPAIR

Closed 29 days ago

US ARMY ENGINEER DISTRICT NASHVILLE
Date published
Closed 60 days ago
Deadline
Closed 29 days ago
Categories
- None

Contact
Ray Kendrick
Email
ray.kendrick@usace.army.mil
Tel
6157367932
Country
United States

OCID
ocds-0c46vo-0421-c6f048bbbe4e4b3c9a943b9b4870eb5f
Description

The contractor will be required to provide all labor, equipment, and additional materials necessary for the removal and replacement of approximately 1,200 lineal feet of 15kV 500 kcmil Compact Sector, Paper Insulated Lead Covered (PILC) low pressure nitrogen filled cable.  The cable is located between Manhole 13 and the Magazine Street Substation in an underground duct bank. A replacement cable shall be installed in the existing duct back and shall be rated 15kV URD and be of 500 kcmil copper. Splice kits shall be provided to connect the existing cable to the newly installed cable. Cable termination and testing from the Magazine substation to the North Power Plant will be conducted.
See Solicitation.