WHSCT - DESIGN TEAM APPOINTMENT FOR WARD 6 (PAEDS) REFURBISHMENT

Buyer: WHSCT


Share this: Share this page using Twitter Share this page using LinkedIn Share this page using Facebook Share this page using Google Share this page using email



Description:
Description:
The WHSCT are seeking to appoint a design team for the proposed refurbishment of Ward 6 (Paediatrics) of the tower block, Altnagelvin Hospital.

The works included the proposed upgrade / replacement of mechanical and electrical infrastructure in the wards to reduce the risk associated with the mechanical and electrical services. The ward will be vacant throughout the duration of the works, however the floors above and below will remain a live acute environment. There will be elements of work located on additional floors which will require work within a live ward, and the amount of disruption must be kept to a minimum.

Mechanical
The work will primarily involve the installation of replacement mains, hot and cold water services to the existing water assets within the wards. It will be necessary to removal all redundant pipework in line with legislative guidance and hospital policy.

Electrical
The work will involve the complete replacement of all electrical services within the wards. All work must be carried out in line with legislative guidance.

The works also include general refurbishment / reconfiguration of the Paediatrics Ward.

It is essential that the works be designed and phased in such a way as to cause the minimum amount of disruption to the live hospital.

Country:
Country:
United Kingdom

Published:
Published date:
Jan 01 1900

Deadline:
Deadline:
Nov 30 2015




OC ID:
Open Contracts ID:

Saved on:
Saved on:

Source ID:
Source ID:
26913


Mail icon: Send an email to Open Opps Twitter logo: Open Opps Twitter page LinkedIn logo: Open Opps LinkedIn page Facebook logo: Open Opps Facebook page


Open Contracting Logo   Open Data Logo