WHSCT - DESIGN TEAM APPOINTMENT FOR GROVE HOUSE REFURBISHMENT

Buyer: WHSCT


Share this: Share this page using Twitter Share this page using LinkedIn Share this page using Facebook Share this page using Google Share this page using email



Description:
Description:
The WHSCT are seeking to appoint a design team for the proposed refurbishment of Grove House, Tyrone and Fermanagh Hospital, Omagh

The refurbishment will provide accommodation for the consolidation of ICT Resources within the Tyrone and Fermanagh Hospital Site. The building will be vacant throughout the duration of the works.

Building
The works will primarily involve replacement of the roof fabric, replacement of windows and doors and complete re-decoration throughout.

Mechanical
The work will primarily involve the installation of a heating system, installation of replacement mains, hot and cold water services to the existing water assets. It will be necessary to removal all redundant pipework in line with legislative guidance and hospital policy.

Electrical
The work will involve the complete replacement of all electrical services. All work must be carried out in line with legislative guidance.

It is essential that the works be designed and phased in such a way as to cause the minimum amount of disruption to the live hospital site.

Country:
Country:
United Kingdom

Published:
Published date:
Jan 01 1900

Deadline:
Deadline:
Nov 30 2015




OC ID:
Open Contracts ID:

Saved on:
Saved on:

Source ID:
Source ID:
26926


Mail icon: Send an email to Open Opps Twitter logo: Open Opps Twitter page LinkedIn logo: Open Opps LinkedIn page Facebook logo: Open Opps Facebook page


Open Contracting Logo   Open Data Logo