WHSCT - BSO SHARED SERVICES ACCOMMODATION REFURBISHMENT

Buyer: WHSCT


Share this: Share this page using Twitter Share this page using LinkedIn Share this page using Facebook Share this page using Google Share this page using email



Description:
Description:
The WHSCT are seeking to appoint a design team for proposed minor refurbishment work for BSO Shared Accommodation on the Second Floor of the Main Building at the Tyrone and Fermanagh Hospital

The works involve minor refurbishing works to the existing office accommodation and toilet area. Works will include upgrading of lighting, replacement floor covering, redecoration, toilet refurbishment and door access system.

The works will be carried out in a live environment. The works must be designed and phased in such a way as to cause the minimum amount of disruption to the service.

The works are to be completed and handed over before the end of the current financial year, 31st March 2015.

The WHSCT confirm that the following consultants will be required to form part of the design team; Lead Consultant, Architect, Mechanical Engineer, Electrical Engineer, Structural Engineer Quantity Surveyor and CDM coordinator. Schedules of duties for these consultants will be included in ITT. It is anticipated that the lead consultant (contract administrator) will be the architect.

The contract period (for consultant services) is 6 months, October 2014 – March 2015, not including the defects liability period.

Country:
Country:
United Kingdom

Published:
Published date:
Jan 01 1900

Deadline:
Deadline:
Oct 17 2014




OC ID:
Open Contracts ID:

Saved on:
Saved on:

Source ID:
Source ID:
23591


Mail icon: Send an email to Open Opps Twitter logo: Open Opps Twitter page LinkedIn logo: Open Opps LinkedIn page Facebook logo: Open Opps Facebook page


Open Contracting Logo   Open Data Logo