Survey & Extension of the Fire Alarm Network System

Buyer: Royal United Hospital Bath NHS


Share this: Share this page using Twitter Share this page using LinkedIn Share this page using Facebook Share this page using Google Share this page using email



Description:
Description:
Introduction

The Royal United Hospital, Bath is a 650 bed district general hospital serving a population of 500,000. It is based on a 53 acre site in the Combe Park area of Bath. The Estate is made up of 64 separate blocks that range in age from the 1700?s up to the present date.

Scope of works

As part of our commitment of continual upgrades of our systems, we need to prepare for the expansion of the Fire Alarm Network. At present, the site wide Fire Alarm network system is on one loop which is nearing its capacity; we need therefore to introduce a second network loop. This will involve tracing the existing loop wiring, breaking into the loop at an appropriate location and taking wiring back to the telephone exchange room where the systems currently report.

Full requirements will be available in the online specification documents.


Issue Date: 21/12/2010

Tender Period: 4 weeks

Return Date: 21/01/2011

Country:
Country:
United Kingdom

Published:
Published date:
Aug 09 2016

Deadline:
Deadline:
Jan 21 2011

Contact:
Contact:
Ian Tiley (Royal United Hospital Bath NHS)

Email:
Email:
ian.tiley@nhs.net

Tel:
Tel:
01225 825452




OC ID:
Open Contracts ID:

Saved on:
Saved on:

Source ID:
Source ID:
366


Mail icon: Send an email to Open Opps Twitter logo: Open Opps Twitter page LinkedIn logo: Open Opps LinkedIn page Facebook logo: Open Opps Facebook page


Open Contracting Logo   Open Data Logo