SHSCT Refurbishment of Acorn Centre at Longstone Hospital Armagh

Buyer: SHSCT


Share this: Share this page using Twitter Share this page using LinkedIn Share this page using Facebook Share this page using Google Share this page using email



Description:
Description:
The project shall comprise the general refurbishment and reconfiguration of the existing Acorn Activity Centre on the Longstone Hospital site, Armagh. The scheme shall include general building works, mechanical installation and electrical installation.

The Contract period for the Project is 10 weeks.

Country:
Country:
United Kingdom

Published:
Published date:
Jan 01 1900

Deadline:
Deadline:
Oct 06 2011




OC ID:
Open Contracts ID:

Saved on:
Saved on:

Source ID:
Source ID:
14457


Mail icon: Send an email to Open Opps Twitter logo: Open Opps Twitter page LinkedIn logo: Open Opps LinkedIn page Facebook logo: Open Opps Facebook page


Open Contracting Logo   Open Data Logo