SHSCT-Installation of New Modular Theatre & Recovery at Daisy Hill Hospital

Buyer: SHSCT


Share this: Share this page using Twitter Share this page using LinkedIn Share this page using Facebook Share this page using Google Share this page using email



Description:
Description:
The Project shall comprise the supply, delivery, installation and commissioning of new modular theatre and recovery accommodation at Daisy Hill Hospital, Newry.

The following fully-functioning (turn-key) accommodation is to be supplied:
• Twin Operating Theatres
• 4 Bed Recovery
• 10 bed Ward
• Endoscopy Decontamination Facility

The accommodation is to be located on a raised steel structure in a specific location (to be erected under a separate enabling works contract); be capable of a direct link with existing theatre accommodation; and suit the existing site infrastructure.

The accommodation must comply with all relevant HTM standards and be complete with all Mechanical and Electrical installations.

Important Note:
The supplier must be capable of delivering, installing and commissioning the aforementioned accommodation and achieve handover to the Trust no later than 6th July 2012.

Country:
Country:
United Kingdom

Published:
Published date:
Jan 01 1900

Deadline:
Deadline:
Nov 30 2011




OC ID:
Open Contracts ID:

Saved on:
Saved on:

Source ID:
Source ID:
14937


Mail icon: Send an email to Open Opps Twitter logo: Open Opps Twitter page LinkedIn logo: Open Opps LinkedIn page Facebook logo: Open Opps Facebook page


Open Contracting Logo   Open Data Logo