Restoration of water levels in the River Lambourn at Weston Mill

Buyer: Defra


Share this: Share this page using Twitter Share this page using LinkedIn Share this page using Facebook Share this page using Google Share this page using email



Description:
Description:
he objective of this project is to repair the water-control structures, to establish sufficient water levels within two SACs (River Lambourn and the River Lambourn and Kennet and Lambourn Floodplain) to maintain the European interest features.

Country:
Country:
United Kingdom

Published:
Published date:
Jan 01 1900

Deadline:
Deadline:
Oct 03 2015

Contact:
Contact:
Francesca Biagi

Email:
Email:
Francesca.Biagi@defra.gsi.gov.uk




OC ID:
Open Contracts ID:

Saved on:
Saved on:

Source ID:
Source ID:
26421


Mail icon: Send an email to Open Opps Twitter logo: Open Opps Twitter page LinkedIn logo: Open Opps LinkedIn page Facebook logo: Open Opps Facebook page


Open Contracting Logo   Open Data Logo