Installation of CHP Boilers and Associated Works

Buyer: Contract Award


Share this: Share this page using Twitter Share this page using LinkedIn Share this page using Facebook Share this page using Google Share this page using email



Description:
Description:
Installation of CHP Boilers and Associated Works

Introduction

The Royal United Hospital, Bath is a 650 bed district general hospital serving a population of 500,000. It is based on a 53 acre site in the Combe Park area of Bath. The Estate is made up of 64 separate blocks that range in age from the 1700?s up to the present date.

Overview

As part of the RUH?s commitment to energy saving throughout the site, we are installing Combined Heating and Power generation plant in four separate locations. At present each of the buildings to be upgraded have their own plantrooms each containing two boilers and associated plant such as pumps, valves etc. Each plantroom will have one of the boilers replaced with a Combined Heating and Power unit (this work is to be done by others); all of the existing wiring and controls are to be stripped out and replaced. Each building is to also have current transformers installed at the building intake position so as to allow metering.

There are four plantrooms in total, three of which are virtually identical whilst Bernard Island Building is somewhat different for the others

.
Full details and requirements to be provided within the tender specification



Scope of Work

Proposed Tender Issue date
9h December 2010

Proposed Tender Duration
2 weeks

Proposed Tender Completion date
23rd December 2010

Country:
Country:
United Kingdom

Published:
Published date:
Aug 09 2016

Deadline:
Deadline:
Dec 23 2010




OC ID:
Open Contracts ID:

Saved on:
Saved on:

Source ID:
Source ID:
361


Mail icon: Send an email to Open Opps Twitter logo: Open Opps Twitter page LinkedIn logo: Open Opps LinkedIn page Facebook logo: Open Opps Facebook page


Open Contracting Logo   Open Data Logo