A66 Crackenthorpe Realignment

Buyer: Highways Agency


Share this: Share this page using Twitter Share this page using LinkedIn Share this page using Facebook Share this page using Google Share this page using email



Description:
Description:
Location: The scheme is located on the A66 between Penrith and Appleby (Approximately 1 mile to the West of Appleby).

The carriageway is single being approximately 9.3m wide.

Details of Work: The works will involve two main phases:

Phase 1 - permanently realigning a 1km section of the A66. The works include, vehicle restraint barrier, drainage, earthworks, carriageway surfacing, kerbing, traffic signs, road markings and construction of a reinforced concrete slab cantilevered from an existing pile cap to carry the footway and utilities plant.

Phase 2 - resurfacing 1.9km of the existing carriageway immediately to the West of the realigned section.

Country:
Country:
United Kingdom

Published:
Published date:
Jun 04 2016

Deadline:
Deadline:
Jun 30 2009

Contact:
Contact:
Evans Karen

Email:
Email:
karen.evans@highways.gsi.gov.uk




OC ID:
Open Contracts ID:

Saved on:
Saved on:

Source ID:
Source ID:
6814


Mail icon: Send an email to Open Opps Twitter logo: Open Opps Twitter page LinkedIn logo: Open Opps LinkedIn page Facebook logo: Open Opps Facebook page


Open Contracting Logo   Open Data Logo